Job Information
BB&E Construction Scheduler in Kittery, Maine
This job was posted by https://joblink.maine.gov : For more information, please see: https://joblink.maine.gov/jobs/1065001
CONSTRUCTION SCHEDULER
Full Time
Portsmouth Naval Shipyard, ME, Kittery, ME, US
Construction Scheduler\ Job Summary:\ \ BB&E is looking for a Construction Scheduler to support our NAVFAC Mid-Atlantic Program in Kittery, MA.\ \ Essential Job Duties and Responsibilities:
The Scheduler provides assistance and technical guidance to engineers/architects exercising construction oversight and design management of Capital Improvements projects. Scope of projects typically is of a complex nature ranging from comprehensive repairs to unique, multi-million-dollar state-of-the-art construction. It is typical for the Scheduler to have some level of engagement with inter-related construction projects associated with a high-visibility Program Initiatives. Project delivery methods include both design bid-build or design-build. Must be able to manage multiple priorities and, when requested, independently develop and provide technical recommendations/ solutions regarding scheduling issues and time impacts on complex problems encountered during the administration of the construction contracts. Routinely communicate and coordinate with other technical and non-technical NA VFAC personnel within the Facilities Engineering Command (FEC) and the various Field Offices. The Scheduler is expected to work independently and take required actions through their own initiative, experience and foresight on all assigned projects
Job Qualifications and Skills:
A. Pre-Construction Award Support
The Scheduler provides support during the design phase of projects to ensure an appropriate construction duration is established for major projects or initiatives. Responsibilities include:
Reviewing scope of individual projects and propose reasonable construction durations to be included in the RFP or solicitation.
Participate in Technical Evaluation Teams (TET) as necessary when selection factors involve the submission of a proposed contractor schedule. The Schedule Analyst shall review and provide recommendations to the TET Chair.
B. Post Construction Award Support
The Scheduler provides support for schedule requirements on all types and sizes of projects that have encountered schedule slippage. Typical duties are associated with modifications, requests for equitable adjustment, and claims. Responsibilities include:
Providing assistance to Field offices to determine if contractor is on schedule.
Reviewing of Baseline Schedules and monthly contractor updates to determine validity and conformance to contract requirements.
Assisting in validation of impacts to the approved construction schedule. The Scheduler must review the contractors TIA proposal and help develop the Governments position regarding delays and/or liability.
Providing analysis on how the contractor can recover, if at all, from current delays to meet the contract completion date.
C. Training
The Scheduler shall possess an understanding of NAVFAC scheduling requirements and supporting software. Responsibilities include but are not limited to:
Developing, maintaining, and providing scheduling training to the field office covering basic understanding of network analysis schedules, critical path method, time impact analysis, baseline, progress, and as-built schedule reviews, and software usage
\ Experience:
- A minimum of 7 years of construction scheduling experience utilizing Primavera P6 or its earlier versions.
- Experience in preparing or analyzing Time-Impact-Analysis as it relates to time extension requests or claims.
- Ability to evaluate Contractors baseline schedules and monthly updates
- Registration as a Planning and Scheduling Professional (PSP) is desirable.
Education:
- Bachelors Degree
Phys cal Requirements:
- Must be able to remain in a stationary position at least 60% of the time.
- Operate office equipment, including computer, copy machine, phone, etc.
- Light lifting, under 10 lbs.
BB&E is a civil, environmental, and energy engineering and consulting company headquartered in Northville, Michigan, which services both the Federal and Industrial sectors throughout the United States. BB&E team members specialize in civil and environmental engineering and